moooon
Motir
Vibe your whole project. Bring an idea — Motir's three AI layers plan it, track it, and ship it, end to end. You're looking at Motir, built in Motir.
- Vibe Project
- Open Source
- AI Agent
- AI Loop
- 1
- requests
- 0
- upvotes
- 145
- planned
- 1,361
- shipped
- ▸MOTIR-21.0 Project bootstrapdone
- ▸MOTIR-101.0.5 Design system & branddone
- ▸MOTIR-161.1 Auth & user accountsdone
- ▸MOTIR-281.2 Workspaces (multi-tenant)done
- ▸MOTIR-361.3 Projectsdone
- ▸MOTIR-431.4 Work-item (issue) data modeldone
- ▸MOTIR-521.5 Web app shell + navigationdone
- ▸MOTIR-591.6 Background job infrastructuredone
- MOTIR-671.7 Set up CLA Assistant + commit Apache ICLA on motir-coredone
- MOTIR-1287Preview deployments use the PRODUCTION database — preview writes mutate live datadone
- MOTIR-2306(motir-core) Raw / Tier-0 RADIUS escapes from the shape-swap layer are repo-wide — route them, then GUARD the radius axis like `swapLayerLint` guards colourdone
- ▸MOTIR-2335The own-box PADDING / HEIGHT axis of the shape swap — decide the density scale, then route the 447 escapes onto ittodo
- MOTIR-2337PLANNING BUG — MOTIR-2306 bundled two axes of very different tractability and sized BOTH from a one-directory sample, and its AC pointed at a token that cannot hold the values it was routingdone
- MOTIR-2373(motir-core) The authed top bar OVERFLOWS below md — the right cluster is 290–409px in a 375px viewport, and it covers the hamburgerdone
- MOTIR-2374Design — what the authed top bar DOES below `md`: the right cluster's control BUDGET, a named disposition for all eight controls, and the `design/shell/` asset set that has never been redrawndone
- MOTIR-2380(motir-core) The Vercel deployment fails on `main` AND on every open PR — read the build log; `next build` is green in CI, so the failure is after the buildcancelled
- ▸MOTIR-2705The platform starter's own maintenance — keeping the vendored copies, CI lanes and scaffold-time defaults true as motir-core movesdone
Showing 17 of 17