Skip to content

moooon

Motir

Vibe your whole project. Bring an idea — Motir's three AI layers plan it, track it, and ship it, end to end. You're looking at Motir, built in Motir.

  • Vibe Project
  • Open Source
  • AI Agent
  • AI Loop
1
requests
0
upvotes
145
planned
1,361
shipped

Motir · Roadmap

MOTIR-4070To Do

Planning bug: a later merge deleted every test subject while the lane-fix work item stayed ready

Opened by Zhu Yue ·

Defect

MOTIR-4041 was authored against four Playwright specs and a rendered /p/* surface in motir-core. A later merged parent pull request deleted all four specs because that surface moved, but the work item remained ready and pinned to motir-core. Dispatch therefore reached an impossible acceptance set.

Evidence

validate_work_item MOTIR-4041 reported moooon-B-V/motir-core#2492 as a later touching merge. Reading that diff showed the four named specs were deleted, not that the requested per-PR cloud lane had shipped.

Correction

Plan cmthsoldd00dshvn8s9w2xplh proposes retiring MOTIR-4041. Replacement public-project coverage belongs to MOTIR-3877 when that story is planned against its final shipped architecture. The lesson store now records that a subsumption advisory on a test path must classify the subject as preserved, moved, replaced, or deleted.

Acceptance criteria

  • The planning record links this defect to MOTIR-4041 and the submitted corrective plan.
  • Future test-card validation treats a later merged deletion or move of the subject as plan invalidation, not delivered coverage.
  • No replacement lane is invented in the repository that no longer owns the rendered subject.

Discussion

No comments yet.

Adding to this discussion signs you in on app.motir.co and brings you back to this request.

Add a comment